A PRIORITIZED PLAN
Question 1
Learning Spaces
New Addition includes:
Two classrooms
Multiple breakout spaces
Rooms for Speech Language Pathologist, Special Education, and Developmental Adapted Physical Education
Renovation includes:
Creation of High School breakout spaces
Creating a Conference room
Creation of life skills lab
Stage improvements including addition of controls, speakers, removable 10 foot stage extension with stair access
Safety & Security includes:
Storm Shelter (as mandated by current State building codes)
ADA Accessibility (ADA lift for stage)
Fall protection rubber surface for playground
Building Maintenance
Upgrade building controls and software
Refurbish roof top units, including ventilation and exhaust upgrades
Add new summer boiler and 2000 gallon propane tank
Replace existing chiller and add cooling to Career and Technical Education area
Replace kitchen ventilation unit and add cooling
Replace dust collector in woods shop
Electrical panel and distribution upgrades
Improve Vikings gym by adding power and microphones
Replace high priority roof sections with adhered rubber roofs
Building envelope improvements, including: masonry upgrades, high priority windows and exterior doors replacement
Parking lot and sidewalk replacement including a new sidewalk on southeast side of school
Site drainage improvements
Question 2
Athletics & Activities
New Addition includes:
New cafeteria/practice gym, restrooms, and storage
New multi-purpose/ wrestling room with storage, coiling door, and wrestling mat hoist.
Renovation includes:
Choir Room: Convert existing weight room into choir room with office, storage, risers, and acoustical treatments
Multi-purpose/ Theater Support Room: Convert existing choir room into multi-purpose/ theater support space
Weight Room: Convert existing multi-purpose/ wrestling room into weight room, rubber floor, and coiling door
Reconfigure kitchen to open to new cafeteria/practice gym
Safety & Security includes:
Add ADA access from parking lot to Varsity softball.